My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Topsoil Middle Pyeatt #1, #2 & #3 Ponds <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - IOSU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br />Data source : (CRG) <br />Utilization % <br />Loose <br />1.125 volume : 8,530 LCY <br />' $97.15 NA <br />$138.49 100 <br />$1.75 15 <br />$32.78 NA <br />$270.17 Total fleet cost/hour : $540.34 <br />Source of estimated volume : Table TR94-1 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 400 feet <br />Unad' t d h <br />lult-11 s.orrection ractors Source <br />Operator skill : 0.85 (user) <br />Material consistency : 1.00 (Cat HB) <br />lus a ourly production : 497.3 LCY/hr Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency <br />description : Visibility: 1.00 (avg.) <br />Consolidated <br />stockpile Job efficiency : 0.83 (lshift/day) <br /> Spoil pile : 1.00 (doz-oc) <br /> <br />Average push gradient : <br />1.00 <br />% (neg) Push gradient : 1.02 (Cat HB) <br />Avera <br />e site altit <br />d Altitude : 1.00 (Cat HB) <br /> <br />g <br />u <br />e : <br />6,800 <br />feet <br />Material weight : <br />0.90 _ <br />(Cat HB) <br />Material w <br />i <br />ht 2 Blade type : 1.00 (S/SU/U) <br /> <br />g <br />e <br />: <br />,550 <br />Ibs/LCY <br />Net correction : <br />0 <br />65 _ <br />Weight descri <br />ti . <br />p <br />on <br />Earth - Dry packed Adjusted unit production : 323 <br />53 <br /> . LCY/hr <br /> Adjusted fleet production : 647,06 LCY/hr <br />JOB TIME AND COST ;. <br />Fleet size : 2 Dozer(s) Total job time : 13.18 Hours <br />Unit cost $0.835 /LCY Total job cost : $7,123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.