Laserfiche WebLink
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth - Dry packed <br />Rated payload : 75,000 pounds <br />Payload capacity: 29.41 LCY <br />Cycle Time : <br />Scraper loading time * : 1.00 minutes <br />Maneuver and spread time : 0.60 minutes <br />load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description :Finn, smooth, rolling, dirtAt. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,800 -2.00 3.00 1.00 2952 0.82 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.82 minutes <br />•' travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.83 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.26 minutes <br />Unadjusted unit production/hour : 1,068.63 LCY/hour *** Adjusted for job conditions : 886.96 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 886.96 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 886.96 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 28.44 Hours <br />Unit cost : $1.442 /LCY Total job cost : $36,385 <br /> <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY ** <br />hourly production reflects volume per scraper pair on push-pull models <br />Job Condition Corrections : Site altitude (ft.) : 6,800 <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br />Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />Return route :