Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />xx: <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />241 State : Colorado PermitrJob #: C1981-010 <br />12/07/2007 <br />JHB <br />County : Moffat <br />Site : Trapper Mine <br />Permit or other job action : Rn5 <br />Task description : Topsoil replacement on Coyote pond <br />::.:...:..:..:....:::::::::._::::::::::::::.::::::::::::.::::::.:::::::.:::.. <br />HOURLY EQUIPMENT COST <br />Cost Bri <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : Cat D10R - 10SU (2005) <br />-Dump area :Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 5, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer grader misctruk <br />% Utilization-machine : 100 NA 100 100 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 $39.50 $21.89 <br />Operating cost/hour : $177.86 NA $138.49 $138.49 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cosUhour : $24.95 NA $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $313.18 NA $256.13 $256.13 $76.10 $64.51 <br />Number of units : 2 0 1 1 1 1 <br />Group subtotals : Work : $626.35 Support : $512.26 Maintenance : $140.61 <br />Total work team cost/hour : $1,279.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 22,425 CCY factor : 1.125 volume : 25,228 LCY <br />Source of quantity take-off :2004 ARR map 1 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />Abbreviation :none <br />Filename : C010-241