2009-09-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-09-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
9/4/2009 7:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/3/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- Weeks of 05/10/09 and 05/17/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />Underground working 2030 (Raven upper tunnel) located within the LOB Delivery Road: The <br />underground working was exposed during site grading of the LOB Delivery road. The working <br />has been flagged with lath and survey ribbon. <br />C) Lateral/Slot Remediation <br />No work performed during shift. <br />III) Storm Water Management Structures <br />A) Best Management Practices (BMP) <br />Silt fencing has been put in place and Best Management Practices are being observed throughout <br />the LOB project. <br />B) Roadside ditch <br />Work was performed from station 16+00 (+/-) to 22+00 (+/-), 40-feet right of centerline of the <br />LOB Delivery Road.. <br />C) LOB Stormwater Culverts <br />No work performed during shift. <br />CQA ACTIVITIES: <br />SUMMARY: <br />Field Observation Summary <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />Underground working 2030 was originally backfilled in the cut area for safety. During final grading of the <br />LOB Delivery Road the 2030 working reappeared. The working has been flagged with lath and survey <br />ribbon. <br />Underground workings 2036 and 2040 located in Transfer Station #5 were exposed and inspected. <br />Continued to observe fill placement on the LOB Pad and LOB Delivery Road throughout the week. <br />Fill placement and minor site grading was completed at Transfer Station #6. <br />Laboratory Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture-Density <br />Compaction testing) for sampled materials. <br />LOB Pad Structural Fill particle size distribution test was in progress. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Planning Items: <br />Unsuitable material will continue to be transported to the Joe Dandy Main Cresson backfill. <br />Sheet 3 of 8 <br />LOB Weekly Report WE 05.16.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.