amec <br />Earth & Environmental <br />right of centerline. Contouring was performed using a CAT D-10 dozer, a CAT D-9 dozer and <br />a CAT D-8 dozer. Material generated as the cut progressed was pushed down the slope. <br />F) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28+00 (+/-) to A36+00 <br />G) Cut to Fill <br />1) VLF <br />A John Deere 850 excavator and a CAT 385 excavator excavated structural fill material <br />between stations J10+00 (+/-) and J16+00 (+/-), approximately 75 to 150 feet right of <br />centerline, J8+00 (+/-) and J10+00 (+/-), approximately 0 to 75 feet right of centerline, J20+00 <br />(+/-) and J22+00 (+/-), approximately 0 to 50 feet right of centerline. A John Deere 850 <br />excavator and a CAT 375 excavator excavated structural fill material between stations J8+00 <br />(+/-) and J12+00 (+/-), approximately 50 to 75 feet right of centerline, J17+00 (+/-) and <br />J20+00 (+/-), approximately 0 to 100 feet right of centerline. A CAT 385 excavator excavated <br />structural fill material between stations A10+00 (+/-) and A12+00 (+/-), approximately 150 to <br />250 feet left of centerline. A John Deere 850 excavator excavated structural fill material <br />between stations J7+00 (+/-) and J9+50 (+/-), approximately 50 to 75 feet right of centerline. <br />The structural fill material was loaded into CAT 777 and 40-ton articulating haul trucks. The <br />material was transported to the following fill areas throughout the shift: <br />Structural fill material was placed between stations F9+00 (+/-) and F12+00 (+/-), <br />approximately 0 to 150 feet right of centerline, A26+00 (+/-) and A30+00 (+/-), approximately <br />20 feet left and right of centerline, A37+50 (+/-) and A40+00 (+/-), approximately 0 to 150 feet <br />right of centerline, F9+00 (+/-) and F12+00 (+/-), approximately 150 feet left and right of <br />centerline, A23+50 (+/-) and A26+50 (+/-), approximately 15 feet left to 50 feet right of <br />centerline, F9+00 (+/-) and F11+00 (+/-), approximately 20 to 75 feet right of centerline, <br />A28+00 (+/-) and A31+00 (+/-), 30 feet left and right of centerline, F7+00 (+/-) and F9+00 <br />(+/-), approximately 20 to 100 feet right of centerline. The structural fill material was spread <br />by a CAT D-8 dozer, CAT D-9 dozer or CAT 966 loader in 18" to 24" lifts. Each lift was <br />moisture conditioned using a CAT 773 water truck (when necessary) and compacted using a <br />10-ton vibratory smooth drum compactor, passing over the entire fill surface at least 4 times <br />(method compaction technique is applicable). <br />Blast pattern drilling was performed by Rockbreakers between stations A13+50 (+/-) and <br />A 14+50 (+/-), approximately 20 to 75 feet right of centerline, A7+50 (+/-) and A8+50 (+/-), <br />approximately 20 to 75 feet right of centerline, and A11+50 (+/-) and A12+00 (+/-), <br />approximately 20 to 75 feet right of centerline using three track mounted drill rigs. <br />H) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Processing area. A <br />CAT D-6 dozer, a CAT 330 excavator, and a CAT 966 front-end loader were used to process <br />the material. <br />VLF Weekly Report WE 08.22.09.D.doc