Weekly Construction Quality Assurance ("CQA") Report: 08/16/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth 8 Environmental <br />Location This Week <br />tons Cumulative <br />(tons Comments <br />So Cresson Clay Processing 6,651 73,612 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 6,651 109,428 <br />I) New ADR Water Tank and Waterline <br />Excavation of the new ADR waterline trench was completed between stations A15+00 (+/-) and <br />A22+00 (+/-) using a CAT 345 excavator. Blast pattern drilling was performed by Rockbreakers <br />between stations A17+50 (+/-) and A19+00 (+/-), using two track mounted drill rigs. Pipe bedding <br />was placed in the bottom of the excavated trench and compacted using the excavator bucket, per <br />project specification. <br />10" and 12" diameter HDPE pipes, previously fusion-welded in 250 and 600-foot runs at the Ames <br />laydown yard, were placed in the new ADR waterline trench. Approximately 600 lineal feet of 12- <br />inch HDPE pipe and 600 lineal feet of 10-inch pipe were placed in the trench. Tracer wire was <br />taped to the top of the pipes. The pipes were covered with pipe bedding material using a CAT 345 <br />excavator and a CAT 966 loader between stations A20+00(+/-) to A22+00(+/-), per project <br />specification. <br />J) Miscellaneous <br />No work performed during the week. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were improved throughout the week. Sumps were also constructed along existing haul <br />roads for storm water control. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />VLF Weekly Report WE 08.22.09.D.doc