My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-01_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-09-01_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
9/2/2009 8:07:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/1/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 08/16/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth $ Envtronmantal <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: August 22, 2009 <br />Reporting Period: 08/16/09 through 08/22/09 <br />Days S M T WI T F S <br />Work Shifts D D D D D - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 41 °F to 53T (+/-) High: 61 °F to 82T (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Topsoil Relocation <br />1) VLF <br />No work performed during the week. <br />D) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />E) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations A12+00 (+/-) and A18+00 (+/-), <br />approximately 100 to 500 feet left of centerline, J 16+00 (+/-) and J 18+00 (+/-), approximately <br />25 to 100 feet right of centerline, J5+00 (+/-) and J12+00 (+/-), approximately 10 to 75 feet <br />VLF Weekly Report WE 08.22.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.