amec <br />Earth $ Envtronmantal <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: August 22, 2009 <br />Reporting Period: 08/16/09 through 08/22/09 <br />Days S M T WI T F S <br />Work Shifts D D D D D - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 41 °F to 53T (+/-) High: 61 °F to 82T (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Topsoil Relocation <br />1) VLF <br />No work performed during the week. <br />D) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />E) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations A12+00 (+/-) and A18+00 (+/-), <br />approximately 100 to 500 feet left of centerline, J 16+00 (+/-) and J 18+00 (+/-), approximately <br />25 to 100 feet right of centerline, J5+00 (+/-) and J12+00 (+/-), approximately 10 to 75 feet <br />VLF Weekly Report WE 08.22.09.D.doc