My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-31_REVISION - C1981041 (4)
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2009-08-31_REVISION - C1981041 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:09 PM
Creation date
9/1/2009 3:08:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
8/31/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Mike Boulay
Type & Sequence
SL5
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />sheet 2 of 2 <br />Scraper Bowl (volume) Basis : <br />Material weight : 2,900 pounds/LCY <br />Material description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 55,000 pounds <br />Payload capacity: 18.97 LCY <br />Struck volume : 18.00 LCY <br />Heaped volume : 23.00 LCY <br />Average volume : 20.50 LCY <br />Adjusted capacity : 18.97 LCY *** <br />' hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 4,850 <br /> Scraper Push dozer Source <br />Scraper loading time 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 600 0.00 5.00 5.00 1292 0.56 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.56 minutes <br />Return route : <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.48 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.65 minutes <br />Unadjusted unit production/hour : 430.08 LCY/hour *** Adjusted for job conditions : 356.96 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 356.96 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,427.85 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 4 Team(s) Total job time : 0.25 Hours <br />Unit cost : $0.482 /LCY Total job cost : $171
The URL can be used to link to this page
Your browser does not support the video tag.