Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />502 State :Colorado Permit/job #: C-1981-041 <br />0813112009 County:Mesa Abbreviation :none <br />JRS Site :Roadside Portals Filename: C041-502 <br />Permit or other job action :Partial Phase 213 Bond Release SI-05 <br />Task description : Replace Topsoil from Stockpile to Approximately 41% of Overland Con <br />HOURLY EQUIPMENT COST _ <br />Shift basis : 1 per day <br />1 quipment Description <br />Scraper work team -Scraper : Cat 623G <br />-Push dozer:NA <br />Cost Bre <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $67.15 NA NA NA NA NA <br />Operating cost/hour : $94.82 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $32.96 NA NA NA NA NA <br />Unit subtotals : $194.93 NA NA NA NA NA <br />Number of units : 4 0 0 0 0 0 <br />Group subtotals : Work : $779.73 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $779.73 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,419 CCY factor : 1.125 volume : 1,596 LCY <br />Source of quantity take-off : Operator Estimate <br />Source of estimated swell factor : CAT Handbook