Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Task # : 505 State :Colorado Permit/job #: C-1981-041 <br />Date : 0813112009 County :Mesa Abbreviation :none <br />User: JRS Site :Roadside Portals Filename :C041-505 <br />Permit or other job action : Partial Phase 213 Bond Release SI-05 <br />Task description :Backfill and Regrade Approximately 5% of Rail Spur Area <br />HOURLY EQUIPMENT COST <br />Description <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 623G <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $49.36 NA NA NA NA NA <br />Operating cost/hour : $90.70 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $31.97 NA NA NA NA NA <br />Unit subtotals : $172.03 NA NA NA NA NA <br />Number of units : 4 0 0 0 0 0 <br />Group subtotals : Work : $688.12 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $688.12 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 305 CCY factor : 1.165 volume : 355 LCY <br />Source. of quantity take-off 1986 Division Estimate <br />Source of estimated swell factor : CAT Handbook