My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-31_REVISION - C1981041 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2009-08-31_REVISION - C1981041 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:09 PM
Creation date
9/1/2009 3:08:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
8/31/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Mike Boulay
Type & Sequence
SL5
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadside Portals C-1981-041 <br />Partial Phase II/III Bond Release RL-05 <br />PROJECT IDENTIFICATION <br />Date : 31-Aug-09 Permit C-1981-041 Site: Roadside Portals <br />User: JRS State : Colorado <br /> Filename: C041-500 County: Mesa <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase II/III Bond Release SL-05 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />505 Backfill and Regrade Approximately 5% of Rail Spur Area 0.25 $171 <br />502 Replace Topsoil from Stockpile to Approximately 41% of Overland Conveyor Area 2.06 $1,608 <br />503 Replace Topsoil from Stockpile to Approximately 5% of Railroad Spur Area 0.12 $90 <br />530 Drill Seed Lowland Mix on SL-05 Release Areas 4.20 $2,798 <br />535 Demolish ad Remove SL-05 Structures 10.00 $3,317 <br /> <br /> Direct Cost Total 16.63 $7,984 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $161 <br /> Performance Bond (1.05% of Direct Costs) $84 <br /> Job Superintendent (at $39.38/hour) 8.32 $327 <br /> Profit (10.00% of Direct Costs) $798 <br /> <br /> <br /> Total Overhead and Profit $1,371 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $9,355 <br /> <br /> <br /> Le-al - Engineering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $398 <br /> Reclamation Management and Administration (4.5% of Contract) $421 <br /> <br /> <br /> <br /> TOTAL BOND AMOUNT $10,174 <br />jrs Page 1 31-08-09
The URL can be used to link to this page
Your browser does not support the video tag.