My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-11_PERMIT FILE - M2009038
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009038
>
2009-08-11_PERMIT FILE - M2009038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:38 PM
Creation date
8/24/2009 3:43:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009038
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2009
Doc Name
112c permit application approval
From
DRMS
To
JSC, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />_ ..:... <br />PROJECT IDENTIFICATION <br />Task #: 01a State : Colorado Permit/job # : M-2009-038 <br />Date : 0811012009 County :Rio Blanco Abbreviation :none <br />_ <br />User : THM Site :Urie Gravel Pit Filename :M038-01a <br />Agency or organization name: DRMS <br />Permit or other job action :Final;Reclamation Cost Estimate <br />Task description : Rip and Rough Grade Compacted Areas <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200; Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $55.27 NA <br /> Dozer operating cost/hour : $95.35 100 <br />Ripper operating cost/hour : $7.17 100 <br /> Operator cost/hour : $35.01 NA <br /> Total unit cost/hour : $192.81 Total fleet cost/hour : $192.81 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 15.00 acres Rip depth (ft) : 1.50 Volume : 36,300 BCY or CCY <br /> <br />Source of estimated quantity: Raciamation Plan and Map <br />Source of estimated l oad factor :NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,908.82 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.'50 feet/pass Site altitude : 5,230 feet <br />Average ripping width : 7.'08 feet/pass Altitude adjustment : 1.00 (Cat HB) <br /> <br />Average ripping length : <br />250.00 feet/pass <br />Job efficiency factor : <br />0.83 _ _ <br />(1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.789 acres/hour Adjusted unit production : 1,584.32 cu. yds./hour <br />Unadjusted production : 1,908.82 cu. yds./hour Adjusted fleet production : 1,584.32 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 22.91 hours <br />Unit cost : $0.'122 per cu. yd. Total job cost : $4,418 <br />
The URL can be used to link to this page
Your browser does not support the video tag.