Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name: DRMS <br />02a State :Colorado <br />0811012009 County: Rio Blanco <br />THM Site : Urie Gravel Pit <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Removal of Earthen Sound Barrier and placement in pit bottom <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 633E Series 2 (2001) <br />-Push'dozer:NA <br />Support equipment -Load area :Cat D8R Series 11 - 8SU (2005) <br />-Dump area : NA <br />Road maintenance -Motor grader :NA <br />-Water truck : Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA misctruk <br />% Utilization-machine : 100 NA 25 NA NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $80.67 NA $48.29 NA NA $7.87 <br />Operating cost/hour : $122.85 NA $23.71 NA NA $5.24 <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $30.01 NA $35.01 NA NA $33.94 <br />Unit subtotals : $233.53 NA $107.02 NA NA $47.05__ <br />Number of units : 2 0 1 0 0 1 <br />Group subtotals : Work : $467.06 Support: $107.02 Maintenance : $47.05 <br />Total work team cost/hour : $621.12 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 39,843 LCY' factor : NA volume : 39.843 LCY <br />Permit/job # :M-2009-038 <br />Abbreviation :none <br />Filename :M038-02a