My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br /> <br /> PROJECT IDENTIFICATION <br /> Task #: 007 State : Colorado Permit/job# : C-1981-018 <br /> Date : 0112612009 County : Rio Blanco Abbreviation :none <br /> User: JDM Site : Deserado Mine Filename : C018-007 <br /> <br /> Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />J <br /> Permit or other job action :Renewal 5 <br /> Task description : Regrade Slot Storage Area <br /> <br /> HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />-- ---- .._..... ...... <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br /> Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cosUhour : $830.14 <br /> MATERIAL QUANTITIES <br />• Initial Swell Loose <br /> volume : 80,730 CCY factor : 1.111 volume : 89,691 LCY <br /> Source of estimated volume: Permit Volume IV <br /> Source of estimated swell factor :Operator Study <br /> <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 225 feet <br />Unadjusted hourly production : 616.7 LCY/hr <br />Material consistency description <br />User provided factor <br />Average push gradient : 20.00 % (? <br />Average site altitude : 5,300 feet <br />Material weight : 2,743 Ibs/LCY <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />• JOB TIME AND COST <br />Fleet size : 4 <br />Unit cost : $0.512 <br />Operator skill : 0.75 <br />Material consistency : 0.95 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.93 <br />Push gradient : 1.43 <br />Altitude : 1.00 <br />Material weight : 0.84 <br />Blade type : 1.00 <br />Net correction : 0.66 <br />Adjusted unit production : 405.47 <br />Adjusted fleet production : 1,621.81 <br />(avg.) <br />(Cat HB) <br />(S/SU/U) <br />_LCY/hr <br />LCY/hr <br />-Dozer(s) Total job time : 55.30 Hours <br />/LCY Total job cost : $45,908
The URL can be used to link to this page
Your browser does not support the video tag.