My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PROJECT IDENTIFICATION <br />Task #: 008 <br />Date : 0112612009 <br />User: JDM <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado Permit/job# : C-1981-018 <br />County : Rio Blanco Abbreviation :none <br />Site: Deserado Mine Filename : C018-008 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Renewal 5 <br />Task description : Regrade and Topsoil Halandras Landfill <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : <br />• MATERIAL QUANTITIES <br />Initial <br /> Utilization % <br />Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $830.14 <br /> <br />volume : 5,785 CCY <br />Swell Loose <br />factor : 1.111 volume : 6,427 LCY <br />Source of estimated volume : Permit Volume IV <br />Source of estimated swell factor :Operator Study <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />User provided factor <br />Average push gradient : 5.00 % (i <br />Average site altitude : 5,300 feet <br /> <br />Material weight : Z 743 Ibs/LCY <br />Weight description : <br />Operator skill : 0.75 (avg.)_ <br />Material consistency : 0.95 (user) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/da) <br />Spoil pile : 0.93 (user) <br />Push gradient : 1.11 (Cat HB_) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.84 _ <br />(user) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.51 <br />U_ S_ER_-PROVIDED WEIGHT DATA Adjusted unit production : 359.93 <br />Adjusted fleet production : 1,439.73 <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 4.46 <br />_LCY/hr <br />LCY/hr <br />Hours <br />Unit cost : $0.577 /LCY Total job cost : $3,706
The URL can be used to link to this page
Your browser does not support the video tag.