2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 State :Colorado Permit/job# : C-1981-018 <br />Date : 0112612009 County : Rio Blanco Abbreviation :none User : JDM Site : Deserado Mine Filename : C018-006 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Renewal 5 <br />Task description : Regrade Overland Conveyor Corridor and Maintenance Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower:-_. 405 _ <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day_ <br />Attachment no. 2:3-shank ripper <br />• <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 80,000 CCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />Utilization % <br />$71.49 NA <br />$103.27 100 <br />$0.00 0 <br />$32.78 NA <br />$207.53 Total fleet cost/hour <br />Loose <br />$830.14 <br />factor : 1.111 volume : 88,880 LCY <br />Source of estimated volume : Permit Volume IV <br />Source of estimated swell factor :Operator Study <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> Operator skill <br />Average push distance : 300 feet Material consistency : <br />Unadjusted hourly production : 437.8 LCY/hr Dozing method : <br /> Visibility: <br />Material consistency description : Job efficiency : <br />User provided factor Spoil pile : <br /> Push gradient : <br />Average push gradient : 5.00 % (pos) Altitude : <br /> <br />Average site altitude : <br />5,300 <br />feet _ <br />Material weight : <br /> Blade type : <br />Material weight : Z 743 Ibs/LCY Net correction : <br />Data source:- (CRG) <br />Source <br />0.75 (avg.) <br />0.95 (user) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shift1day) <br />0.93 (user) <br /> <br />0.90 _ <br />(Cat HB) <br />1.00 (Cat HB) <br />0.84 (user) <br />1.00 (S/SU/U) <br />0.42 <br />Adjusted unit production : 182.36 LCY/hr <br />Adjusted fleet production : 729.42 LCY/hr <br />JOB TIME AND COST <br />• Fleet size <br />4 Dozer(s) Total job time : 121.85 Hours <br />Unit cost : $1.138 /LCY Total job cost : $101,152 <br />