My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-28_INSPECTION - M1990057
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1990057
>
2009-07-28_INSPECTION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:10 PM
Creation date
7/29/2009 8:50:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
INSPECTION
Doc Date
7/28/2009
Doc Name
Response to the specific problems noted during the inspection
From
Calais Resources, Inc.
To
DRMS
Inspection Date
6/18/2009
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Report - Problem 3 <br />A drum of Cyanobrik and two other unmarked drums were observed in the storage area during <br />the inspection. <br />Inspection Report - Corrective Action <br />The operator must within 30 days submit documentation of removal of the drums from the site <br />and proper disposal or proper end use of the materials. <br />Operator Response -- Extension request for removal of the drums <br />July 23, 2009 <br />The Leadville Mill has contracted with PSC Environmental Services Division, 2045 West Union <br />Avenue, Bldg. G, Englewood, Colorado for the removal and transport of 2ea. Aerofloat 242 55- <br />gallon drums, I ea. 30•-gallon drum of unknown liquid, I ea. 20-gallon drum of unknown solid <br />(assumed to be cyanide, but the drum has not been opened), and I-ea. 30-gallon drum of <br />Cyanobrik. The contract was executed on July 20, 2009. The material is scheduled to be moved <br />on July 28, 2009. <br />An extension of 60 days is requested to complete the removal, transport and disposal of the <br />above materials. The initial removal and transport hazardous waste manifest document will be <br />forwarded to the Division within 30 days. <br />A completed hazardous waste manifest will be supplied to the Leadville Mill and forwarded to <br />the Division following treatment or disposal of the material. It is assumed this will occur within <br />60 days.
The URL can be used to link to this page
Your browser does not support the video tag.