My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-28_INSPECTION - M1990057
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1990057
>
2009-07-28_INSPECTION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:10 PM
Creation date
7/29/2009 8:50:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
INSPECTION
Doc Date
7/28/2009
Doc Name
Response to the specific problems noted during the inspection
From
Calais Resources, Inc.
To
DRMS
Inspection Date
6/18/2009
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Report - Problem 4 <br />Evidence of erosion from the three temporary ore piles at the mill site was observed during the <br />inspection. <br />Inspection Report - Corrective Action <br />The operator must with in 30 days submit proof of erosion control for the three temporary <br />stockpiles. <br />Operator Response -- Extension request of erosion. control <br />July 23, 2009 <br />The Leadville Mill has elected to use a combination of erosion and sediment control measures <br />for the temporary stockpiles. The existing controls (natural minor depressions, constructed <br />berms, and vegetative filters) will be augmented with silt fence on the downslope sides of the <br />temporary stockpiles. The silt fence is to be located within several feet of the permit/disturbed <br />area boundary as a temporary perimeter siltation control device. <br />The permit/disturbed area boundary stakes have been reestablished around the stockpiles. Pre- <br />attached fabric silt fence with 2"x2"0' wood posts on 10 foot centers has been purchased and <br />delivered to the site. The skid steer loader with trencher attachment has not arrived on site. A <br />extension of 30 days is requested to install the fence. The Leadville Mill will supply the <br />Division with a typical "as-built" installation diagram of the silt fence and pictures of the <br />installation. <br />The silt fence installation will follow these guidelines: <br />• trench 6-8in deep <br />• silt fence fabric 6-12in placed in trench <br />• fabric buried, trench back filled and tamped <br />• shallow sediment storage depression upslope of the installed silt fence <br />• fabric NOT INSTALLED across channels, culverts, drainages
The URL can be used to link to this page
Your browser does not support the video tag.