My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (39)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:12:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix D- Tech Specs 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecO <br />0 1.03 QUALITY ASSURANCE <br />A. All Work shall be constructed, monitored, and tested in compliance with requirements in the <br />Construction Quality Assurance Plan (Section 01400.2). CONTRACTOR and MANUFACTURER <br />shall participate and comply with all items in these SPECIFICATIONS and requirements of the CQA <br />plan. <br />B. CONTRACTOR shall ensure that geotextile MANUFACTURER has an internal product quality <br />control program that meets Contract requirements. <br />C. CONTRACTOR shall be aware of all activities outlined in the Construction Quality Assurance Plan, <br />and the CONTRACTOR shall account for these activities in the construction schedule. <br />D. CONTRACTOR shall assure that the geotextile is delivered to the site at least 14 calendar days prior <br />to installation to allow sufficient time for conformance testing, if necessary. <br />E. Geotextile rolls that do not meet the requirements of this SPECIFICATION will be rejected. <br />CONTRACTOR will be required to replace the rejected material with new material that complies <br />with the SPECIFICATIONS, at no additional cost to CC&V. <br />F. In order to prevent weather-damaged geotextile from being placed, the following Quality Assurance <br />procedures shall be followed: <br />1. CONTRACTOR shall perform its Work and utilize sufficient ballast as necessary to <br />Is prevent wind uplift of the geotextile panels. <br />2. If weather damage should occur, CERTIFYING ENGINEER shall determine if the <br />geotextile shall be repaired or replaced. Weather damage to the geotextile will include tears <br />and dirty fabric, as determined by the CERTIFYING ENGINEER. <br />3. Repair or replacement of the weather-damaged geotextile shall be completed by <br />CONTRACTOR at no additional cost to CC&V. <br />4. As determined by MANAGER and CERTIFYING ENGINEER, the geotextile panel may <br />be rejected at no cost to CC&V. <br />1.04 DELIVERY, STORAGE, AND HANDLING <br />A. Packing and Shipping <br />1. Geotextile shall be supplied in rolls wrapped in relatively impenneable and opaque <br />protective covers, with straps for unloading. <br />2. Geotextile rolls shall be marked or tagged with the following information. <br />a. MANUFACTURER's name <br />b. Product information <br />c. Roll number <br />d. Batch of lot number <br />Section 02777 Page 2 of 5 September 3, 2008 <br />Geotextile Revision 1 <br />SAProjects\1125 CC&V Phase 5 VLF\I - Tech Specs\Arequa IFC Specs\02777.rt.doc
The URL can be used to link to this page
Your browser does not support the video tag.