My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (39)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:12:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix D- Tech Specs 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec* <br />0 SECTION 02777.0 GEOTEXTILE <br /> <br />PART 1: GENERAL <br />1.01 SUMMARY <br />This SPECIFICATION describes requirements for the manufacture, supply, and installation of the geotextile in <br />the Underdrains, and Leak Detection System, as shown on the DRAWINGS; and constriction quality control <br />monitoring. All procedures, operations, and methods shall be in strict compliance with the <br />SPECIFICATIONS, the Construction Quality Assurance Plan, and the DRAWINGS. <br />1.02 SUBMITTALS <br />A. Submittals with Bid Documents <br />CONTRACTOR shall provide the following information relating to the geotextile <br />MANUFACTURER with its proposal. <br />Information from MANUFACTURER including company name, address, telephone <br />number, the names of the company president and quality control manager, and narrative of <br />the company history. <br />2. Description of MANUFACTURER's manufacturing capabilities: <br />• <br />a. Information on plant size, equipment, personnel, number of shifts per day, and <br />capacity per shift. <br />b. A list of standard material properties and test methods employed to arrive at the <br />values for each. As a minimum, the list shall include properties given in Part 2 of <br />this Section. <br />3. The Quality Control Manual followed during the manufacturing process including those for <br />the polymer material and for detecting foreign objects in the finished goods, and a <br />description of the quality control laboratory facilities, including the name and telephone <br />number of the quality control manager. Upon review of the Quality Control Manual, the <br />MANAGER and CERTIFYING ENGINEER may request additional testing during the <br />manufacturing process at no additional cost to CC&V. <br />B. CONTRACTOR shall provide the following information after contract award but within ten (10) <br />days prior to material arrival on-site and prior to commencement of the work: <br />The geotextile MANUFACTURER shall provide written certification that the geotextile to <br />be used meets the requirements of the Cresson Project and has been continuously inspected <br />for the presence of needles and geotextile was found to be needle free. <br />2. A copy of the MANUFACTURER's geotextile QC test results of properties outlined in Part <br />2 of this Section. The MANAGER reserves the right to refuse use of any geotextile <br />supplied without the proper QC documentation. <br />3. A detailed list of performance criteria for the geosynthetic material being produced for this <br />project. (Note: Performance criteria are sometimes referred to as "minimum property <br />values." Refer to Part 2 of this Section for geotextile properties and test: methods.) <br />Section 02777 Page 1 of 5 September 3, 2008 <br />Geotextile Revision 1 <br />SAProjects\1125 CC&V Phase 5 VLF\I - Tech SpecsVlrequa IFC Specs\02777.rt.doc
The URL can be used to link to this page
Your browser does not support the video tag.