My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:08:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix C- Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addrolk <br />ame <br />Earth & Environmental <br />Underground working 2015 (Tornado Shaft) was exposed on Friday. Work has started to fill the <br />shaft with oversize rock for backfill. <br />Underground working 2020, northwest of the LOB Pad, has been backfilled with minus 24-inch on <br />site material. <br />C) Lateral/Slot Remediation <br />No work performed during shift. <br />III) Stormwater Management Structures <br />A) LOB Stormwater Culverts <br />No work performed during shift. <br />B) Roadside ditch <br />No work performed during shift. <br />C) Best Management Practices (BMP) <br />Best Management Practices are performed throughout the LOB project. <br />IV)LOB Geosynthetics <br />A) LLDPE Geomembrane 80 and 100 mil LLDPE <br />Observed and assessed the damage to the LOB Pad geomembrane due to blasting on the LOB <br />Delivery Road. Fly rock damaged the liner. On Saturday, Berhan Keffelew, :Environmental <br />Protection Specialist with the State of Colorado, requested that all panels be removed with the <br />exception of the 5H: IV slope tying in to the Phase IV VLF geomembrane. There are <br />approximately 8 repairs needed on the 5H: 1V slope. All other existing panels will be removed and <br />replaced using 100 mil single sided textured LLDPE geomembrane. <br />Lone Star arrived on site Saturday. Work commenced on the temporary water storage pond. Work <br />on the LOB Pad to start on Sunday. <br />Lone Star Personnel: Equipment: <br />1-Foreman 1- Double fusion welder, 1-Extrusion Welder <br />1-Seamer/Operator 2 Generators, 1 Tensiometer <br />4- Laborers <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />Double shift work activities for the past week were overburden rock excavation and transport to the Joe <br />Dandy Main Cresson backfill area. The work concentrated within the upper and mid sections of the LOB <br />Delivery Road from station 32+00 (+/-) advancing to station 26+00 (+/-) and stations 2+00 (+/-) to 4+00 <br />Sheet 3 of 9 LOB Weekly Report WE 04.25.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.