My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:08:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix C- Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIC%k <br />ame <br />Earth & Environmental <br />The LOB Delivery Road between approximate stations 32+00 (+/-) to 27+50 (+/-) and stations 2+00 (+/-) <br />to 3+00 (+/-) were drilled and shot this week. Rockbreakers has been working double shifts throughout the <br />week. <br />AMEC observed the backfilling of underground working 2020. Underground workings 2036 and 2030 <br />were backfilled during excavation in the cut area for safety. Underground working 2015 (Tornado Shaft) <br />was exposed on Friday. A small amount of backfilling was performed to level the surface around the <br />shaft. <br />Observed and assessed the damage to the LOB Pad geomembrane due to blasting on the LOB Delivery <br />Road. All the panels will be removed with the exception of the 5H: IV slope tie-in to the Phase IV <br />geomembrane. <br />Concrete testing for the Conveyor Transfer Station #4, retaining wall: Test specimens were cast for <br />compressive strength. <br />Laboratory Testing Summary: <br />Laboratory testing continues (Gradations, Atterberg Limit, and Moisture-Density Relationships) for <br />previously sampled materials, throughout the shift. Permeability testing continues at an off-site <br />laboratory. Geogrid samples have been delivered to an off site-testing laboratory for conformance testing. <br />Concrete cylinders have been delivered to an off site-testing laboratory for compressive strength testing. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Planning Items: <br />Repairs on the LOB Pad geomembrane, work will start on Sunday. Continue underground workings <br />remediation in the LOB Delivery Road and Conveyor Corridor. Continue blasting and transporting shot <br />overburden to the Joe Dandy Main Cresson backfill. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Construction meeting on April 21, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily safety meetings are conducted prior to each shift. These meetings are used to discuss work areas, <br />procedures, testing requirements, etc. <br />AMEC: <br />Derek Witter, P.E., Project Manager - On site Monday and Tuesday to review general project status. <br />Sheet 4 of 9 <br />LOB Weekly Report WE 04.25.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.