amec'0 <br />Earth & Environmental <br />Near Station 34+00 (+/-), right of centerline on the LOB Delivery Road, a shaft has been <br />found at the existing toe of the cut slope. This appears to be another underground working, <br />which was not known. Ames survey will locate the shaft. At this time, the shaft has been <br />backfilled with rock for safety and is marked with lath and flagging. Based on information <br />provided by Ames, the shaft is within a cut area and may be removed once the road is <br />completed. <br />Underground working 2039: Full-time observation during the week on the placement of <br />three layers of geogrid and select structural fill. Work conforms to the Remediation Plan <br />prepared by AMEC. To date: 3860 square feet of geogrid and 119 cubic yards of select <br />structural fill have been placed and tested for compaction. Test results by Nuclear Methods <br />(ASTM D-2922 &3017) exceed 97% of Proctor density, (ASTM D-698). Moisture <br />contents are near optimum. <br />C. Lateral/Slot Remediation <br />No work performed during shift <br />III. Stormwater Management Structures <br />A. LOB Stormwater Culverts <br />No work performed during shift. <br />B. Roadside ditch <br />No work performed during shift. <br />C. Best Management Practices (BMP) <br />No work performed during shift. Existing silt fencing structures appear to be in good <br />condition. <br />IV. LOB Geosynthetics <br />A. LLDPE Geomembrane 80 and 100 mil LLDPE <br />LOB Pad: Lone Star has completed the deployment of approximately 36,050 square feet of <br />geomembrane liner on Wednesday. Panel numbers 1-17 are 80-:mil LLDPE, smooth, <br />which encompassed approximately 34,530 square feet. The remaining panels, 18-21, are <br />100-mil LLDPE textured one side (smooth side up), which encompassed approximately <br />1,520 square feet. 100-mil LLDPE textured one side was used to complete the pad because <br />the contractor was short of 80-mil LLDPE, smooth geomembrane. All geomembrane <br />deployed, including seaming and testing, is inspected and recorded by AMEC personnel. <br />All trial welds witnessed, including 80-to 80 mil, 80-to 100 mil, and 100-to 100 mil, were <br />tested and recorded per the project specifications. A total of 6-trial fusion welds were <br />witnessed and recorded. 1,925 lineal feet of fusion welding was observed. <br />On Thursday, all extrusion trial welds were witnessed and tested prior to start-up. 139 <br />lineal feet of extrusion welding was observed for the tie-in to the existing Phase IV <br />Geomembrane. Four patches were completed. Air channel testing; is completed on 20 <br />seams. All air channel tests passed. The results are recorded. <br />Ambient temperatures ranged from 357 to 40°F during the welding process, both days. <br />The work to date conforms to the Project specifications. <br />Sheet 4 of 11 <br />LOB Weekly Report WE 04.18.09.D