ame <br />Earth & Environmental <br />passing with results of 97% and 98% of D-698 (Standard Proctor Density). <br />Moisture contents near optimum. <br />With the remediation work completed for underground working 2039, located <br />within conveyor corridor 1, method specification structural fill resumed. <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />SGOSA (Squaw Gulch Overburden Storage Area) Dump 5: <br />Summary of SLF processing for the week. <br />Location This Week <br />tons Cumulative <br />(tons) Comments <br />I <br />SGOSA Dump 5 Clay 27,496 New plant, start-up on Wednesday <br />Processing <br />Totals 27,496 <br />G. South Cresson Clay Stockpile <br />The mine has been transporting clay to the South Cresson stockpile off and on during the <br />week. <br />H. AGOSA (Arequa Gulch Overburden Storage Area) Material Processing <br />Continue to produce materials for the VLF and LOB. Processing Drain Cover Fill from <br />material delivered by CC&V Mine is complete. Drain cover for the LOB Pad <br />geomembrane. <br />1. Miscellaneous <br />Placement of less than 1 cubic yard of transit mixed concrete placed on the transformer pad <br />for the future millwright shop. 3-concrete cylinders were cast for compressive strength <br />testing. <br />Placement of approximately 34 cubic yards of transit mixed concrete placed on the <br />retaining wall footing located in conveyor transfer station 4. Three concrete cylinders were <br />cast for compressive strength testing. Work performed on Wednesday. <br />II. Underground Working <br />A. Drilling <br />No work performed during shift. <br />B. Mine Shaft/Stope Remediation <br />Underground working 2036, located within the planned LOB conveyor transfer station 5: <br />Work continues to expose the remainder of the shaft and stope as the cut advances down <br />slope and up slope from the existing underground working. Shaft and stope is backfilled as <br />the cut advances. <br />Underground working 2030 (Raven upper tunnel), located within the; LOB Delivery Road: <br />As the cut continues, AMEC recommends backfilling the shaft (for safety) with -24-inch <br />on site rock. Therefore, it is anticipated the shaft will be removed once the LOB Delivery <br />road is nearing plan grade. <br />Sheet 3 of 11 <br />LOB Weekly Report WE 04.18.09.D