Laserfiche WebLink
<br />• <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION <br />ameO <br />Earthworks activities associated with the LOB relocation included the following: <br />¦ Underground workings remediation, including excavation, confirmatory drilling, <br />installation of CSB; <br />¦ Site grading, including cut/fill and blasting; <br />¦ SLF installation, placement and compaction, depth verification testing, and preparation <br />of SLF surface for geomembrane deployment; and <br />¦ DCF placement above the upper geomembrane layer. <br />Ames generally used the following equipment during construction: <br />¦ Bobcat S130 Skid-Steer Loader; <br />¦ Caterpillar D6R Dozer (4); <br />¦ Caterpillar D8R Dozer (3); <br />¦ Caterpillar D9R Dozer; <br />¦ Caterpillar D10T Dozer; <br />¦ Caterpillar 966G Loader (4); <br />¦ Caterpillar 988 Loader; <br />¦ Water Trucks (2); <br />¦ Caterpillar 773 Water Wagon; <br />¦ Caterpillar 14G Motor-Grader; <br />¦ Caterpillar 140H Motor-Grader; <br />¦ Caterpillar CS563 Compactors (2); <br />¦ Caterpillar 320 Trackhoe; <br />¦ Caterpillar 345 Trackhoe; <br />S1PROJECTS\1125E CCV CQA\H3 - CONSTRUCTIOMLOB CERT REPORT\REPORT BODY10B CERT REPORT 2009.07.07.DOC <br />5