My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
7/21/2009 11:01:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
QA Mon. & Test Results Load Out- Bin Location
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results ameO <br />Load Out Bin Relocation <br />• July 7, 2009 <br />1.3.1 Daily Construction Summary Reports <br />AMEC prepared daily construction summary reports as well as photographic documentation <br />(Appendix A) throughout the project to document the key elements of construction and the CQA <br />activities that occurred. On-site AMEC CQA personnel, the Certifying Engineer and the Project <br />Engineers discussed construction activities on a regular basis. In addition, field personnel <br />prepared daily observation reports. AMEC submitted these daily reports and a daily summary <br />report to CC&V. Daily reports are not included in this report but were available for Colorado <br />Division of Reclamation, Mining and Safety (DRMS) review during the course of the project. <br />1.3.2 Weekly Construction Summary Reports <br />AMEC prepared weekly construction summary reports which were submitted to CC&V and to <br />the DRMS. Weekly Reports from the period of April 3rd 2009 through May 6th 2009 are <br />presented in Appendix C. <br />1.3.3 Project Specifications <br />All work was performed in accordance with the design plans and specifications in Amendment <br />No. 8 to Mining Permit M-1980-244 and subsequent revisions as approved by DRMS. IFC <br />Drawings are presented in the Drawings section of this report and project technical <br />specifications are presented in Appendix D. <br />1.4 Record Survey Documentation <br />Ames Construction of Aurora, Colorado provided the Record Drawings for the activities <br />associated with the LOB relocation. A Colorado Registered Land Surveyor prepared the <br />drawings. The Record Drawings prepared by Ames are presented in Appendix E. The <br />Surveyor's certificates are presented in Appendix F. Ames also provided locations for SLF <br />density tests, SLF depth checks, geomembrane panels, and destructive tests, which were used <br />by AMEC to develop test summaries and the geomembrane panel layout drawing. <br />1.5 Certification Boundary <br />Figure 2 presents the boundary of the LOB that is being certified in this report. The work <br />completed within the certification boundary included underground workings remediation; site <br />grading; subgrade preparation; SLF installation, placement and compaction; installation of 100- <br />mil single sided texture and 80-mil smooth LLDPE geomembrane; and DCF placement. <br />• <br />SAPROJECTS11125E CCV COA\H3 - CONSTRUCTION\LOB CERT REPORT)REPORT BODV\LOB CERT REPORT 2009.07.07.DOC 4
The URL can be used to link to this page
Your browser does not support the video tag.