Laserfiche WebLink
TABLE 3 - Continued <br />Well Status Date Plugged Comment <br /> & Abandoned <br /> Vegetation and storm water management ongoing on <br />20-30 Plugged & 9/7/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br /> only - 0.02 acres in 2000. <br /> Vegetation and storm water management ongoing on <br />20-31 Plugged & 9/7/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br /> - only - 0.02 acres in 2000. <br /> Vegetation and storm water management ongoing on <br />20-32 Plugged & 9/6/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br /> -only - 0.02 acres in 2000. <br /> Long term Vegetation and storm water management ongoing. <br /> stand-by long Lateral Piping and well skid in place. Long string <br />20-33 string only. 9/2/04 passed MIT 2008, short string plugged & abandoned <br /> Bridge Plug Set Dec 2008. Interim reclamation on top soil pile only - <br /> 0.02 acres in 2000. <br /> Vegetation and storm water management ongoing on <br />20-35 Plugged & 9/9/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br /> only - 0.02 acres in 2000. <br /> Long term Vegetation and storm water management ongoing. <br />20-36 stand-by Bridge 9/1/04 Lateral Piping and well skid in place. Well passed MIT <br /> Plugs Set 2006. Interim reclamation on top soil pile only - 0.02 <br /> _ acres in 2000. <br /> Long term Vegetation and storm water management ongoing. <br />20-74 stand-by Bridge 8/19/04 Lateral Piping and well skid in place. Well passed MIT <br /> Plugs Set 2006. Interim reclamation on top soil pile only - 0.02 <br /> acres in 2000. <br /> Vegetation and storm water management ongoing on <br />20-76 Plugged & 9/6/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br />_ only - 0.02 acres in 2000. <br /> Alluvial monitoring well. Installed during test mine <br /> phase to monitor down gradient of test mine ponds. <br />21-2 Ground Water Well in use for Well pad and road still in use. Same pad as 21-3 well. <br /> monitoring well monitoring Interim reclamation on top soil pile only approximately <br /> 0.02 acres in 2000. Vegetation and storm water <br />Ground Water Well in use for and road still in use. Same pad as 21-2 well. Interim <br />21-3 monitoring well monitoring reclamation on top soil pile only approximately 0 02 <br /> acres in 2000 recorded with 21-2 above. Vegetation <br /> and storm water management ongoinnc._ <br /> Nested wells (4 zones). Well pad and road still in use <br />21-4 Ground Water Well in use for Road is two lane track. Area reclaimed along with 2C <br />monitoring well monitoring 14 production well pad. Vegetation and storm water <br /> management ongoing. <br /> Alluvial monitoring well. Well pad and road still in use <br />21-5 Ground Water Well in use for Road is two lane track used by rancher for irrigation. <br />monitoring well monitoring Vegetation and storm water management ongoing. <br />American Soda, L.L.P 17 <br />DRMS Annual Report <br />July 9, 2009