Laserfiche WebLink
TABLE 3 - Continued <br />Well F Status Date Plugged Comment <br />& Abandoned <br />20-3 Plugged & I 6/17/04 commercial phase. Well was on test mine pad. Not <br />Abandoned reclaimed. Test mine pad still in use. Cast over slope <br />and top soil pile reclaimed 0.5 acres in 1998/1999. <br />Ground water monitoring well used for levels only. Or <br />204A Ground water Well in use for pad with 20-413. Upper aquifer ground water monitorin <br />monitoring well monitoring well (A Groove) Well pad and road still in use. <br />20-4B Ground Water Well in use for Well pad and road still in use. Interim reclamation on <br />monitoring well monitoring top soil pile only approximately 0.02 acres in 2000. <br /> Vegetation and storm water management ongoing. <br /> Upper aquifer monitoring well (Uinta) pad still in use. <br />Ground Water Well in use for Road is two lane track leading to TDR subsidence well <br />20-5 <br />monitorin <br />well ! <br />monitoring at 20-12. Area reclaimed with 20-11 and 20-12 <br />g <br />20-6 <br />(this well Plugged & <br />not Abandoned <br />shown on <br />map) <br />20-8 Ground Water <br />monitoring well <br />20-9 Ground Water <br />monitoring well <br /> <br /> storm water management ongoing-- - - <br /> Former Class I Disposal Well in service during test <br /> mining phase only. Well pad and road contoured and <br />10/11/00 reseeded - 0.8 acres in 2000. Pad reseeded in 2005 <br /> 0.2 acres. Vegetation and storm water management <br /> m9o.in_g._ <br /> Upper aquifer monitoring well (Uinta). Well was former <br />Well in use for supply well for test mine and sits on test mine pad still <br />monitoring in use. No separate top soil pile. Vegetation and storm <br /> water management ongoing <br /> Lower aquifer monitoring well (B Groove). Well <br />Well in use for installed to monitor down gradient of 20-6 Class I <br /> Disposal Well during test mine. Continued in <br />monitoring commercial phase. Well pad and road - 0.1 acres. <br /> Production wells No toP soil Pile Ve etation and <br />9 <br />Tnn cnil Hilo caariari ?nnn - n n? nrrac <br />20-10 Ground Water Well in use for road still in use. Interim reclamation on top soil pile <br /> monitoring well monitoring approximately 0.02 acres in 2000. Vegetation and <br /> storm water management ongoing. <br />20-11 Plugged & 6/16/04 Well pad and road contoured and reseeded. <br /> Abandoned Approximately 0.4 acres reclaimed 2005. <br /> Abandoned TDR <br />20-12 Subsidence 6/17/04 <br /> Monitoring Cable <br /> Installed <br /> <br />20-14 Plugged & 7/9/04 <br /> Abandoned <br /> Long term 1 <br />20-19 stand-by short 7/24/04 <br /> string only. <br /> Bridge Plug Set <br />American So da. L.L.P. <br />DRMS Annu ol Report <br />July 9, 2009 <br />Approximately 0.2 acres reclaimed 2005. Two lane <br />tracks provide access to TDR cable in well 20-12 and <br />well 20-5 Uinta ground water monitoring well. <br />Vegetation and storm water management ongoing. <br />Test mine well continued as production well in <br />commercial phase. Well pad and road contoured and <br />reseeded. Approximately 0.5 acres reclaimed in 2005. <br />Two lane track remains for access to 21-4 ground water <br />i Lateral Piping and well skid in place. Short string <br />passed MIT 2008, long string P & A Dec 2008. Interim <br />reclamation on top soil pile only - 0 02 acres in 2000. <br />10