Laserfiche WebLink
TABLE 3 - Continued <br />Well Status Date Plugged Comment <br /> & Abandoned <br />21-15 Plugged & 6/18/04 Well pad and road contoured and reseeded. <br /> Abandoned Approximately 0.6 acres reclaimed in 2005 <br /> <br />21-16 Plugged & <br />9/8/04 Well pad and road contoured and reseeded. <br /> Abandoned Approximately 0.5 acres reclaimed in 2005 <br /> Ground Water Well in use for Alluvial monitoring well. Well pad and road still in use. <br />28-1 monitoring well monitoring Road is two lane track used by rancher for irrigation. <br /> Ve ec,?tation and storm water management ongoing. <br />28-17 Plugged & 6/15/04 Well pad and road contoured and reseeded. <br />_ Abandoned Approximately 0.8 acres reclaimed in 2005 <br /> Long term Vegetation and storm water management ongoing. <br />28-21 stand-by Bridge 7/21/04 Lateral Piping and well skid in place. Well passed MIT <br /> Plugs Set 2006. Interim reclamation on top soil pile only - 0.03 <br /> _ acres in 2000. <br /> <br />28-41 Plugged & <br />6/16/04 Well pad and road contoured and reseeded. <br /> Abandoned Approximately 0.9 acres reclaimed in 2005 <br /> Lower aquifer monitoring well (B Groove). Well pad <br />29-2 Ground Water Well in use for and road still in use. Road is two lane track adjacent to <br /> monitoring well monitoring natural gas pipeline ROW. Vegetation and storm water <br />i <br /> ------ - management ongo <br />ng. <br /> Upper aquifer monitoring well (A Groove). Well pad <br /> Ground Water Well in use for and road still in use. Road is access to 29-24 <br />29-3 monitoring well monitoring production well. Interim reclamation on top soil pile only <br /> approximately 0.02 acres in 2000. Vegetation and <br /> storm water management ongoing. - <br /> Nested monitoring well (4 zones). Well pad and road <br />29-4 Ground Water Well in use for still in use. Interim reclamation on top soil pile only <br /> monitoring well monitoring approximately 0.02 acres in 2000. Vegetation and <br /> - storm water management ongoing. _ <br /> <br />29-20 Plugged & <br />9/9/04 Well pad and road contoured and reseeded. <br /> Abandoned I Approximately 0.3 acres reclaimed in 2005 <br /> Vegetation and storm water management ongoing on <br />29-22 Plugged & 9/9/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br /> only - 0.04 acres in 2000. <br /> _ <br />Vegetation and storm water management ongoing on <br /> Plugged & pad and access road. Well skid remains on pad. Well <br />29-23 <br />Abandoned 10/24/06 failed MIT in 2004. Well was not P & A until 2006 due <br /> to rig availability. Interim reclamation on top soil pile <br /> only - 0.02 acres in 2000. <br /> Vegetation and storm water management ongoing on <br />29-24 Plugged & 9/8/04 pad and access road. Well skid remains on pad. Well <br /> Abandoned failed MIT in 2004. Interim reclamation on top soil pile <br /> only - 0.4 acres in 2000. <br /> Long term Vegetation and storm water management ongoing. <br />29-26 stand-by Bridge 8/13/04 Lateral Piping and well skid in place. Well passed MIT <br /> Plugs Set 2006. Interim reclamation on top soil pile only - 0.05 <br /> acres in 2000. <br /> Long term Vegetation and storm water management ongoing. <br />29-27 stand-by Bridge 7/28/04 Lateral Piping and well skid in place. Well passed MIT <br /> Plugs Set 2006. Interim reclamation on top soil pile only - 0.02 <br />_ I acres in 2000. - <br />American Soda. L.L.P 18 <br />DBMS Annual Reporl <br />July 9, 2009