Laserfiche WebLink
Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br /> <br />MATERIAL QUANTITIES ......... . ....:.... . <br />Initial Swell Loose <br />volume : 100 CCY factor : 1.060 volume : 106 LCY <br /> <br />Source of estimated volume : Permit Exhibit 25, p. 10 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,718.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.81 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,850 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Gravel - Dry (114 =2"diam.) Adjusted unit production : 621.51 LCY/hr <br /> Adjusted fleet production : 2,486.04 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.04 Hours <br />Unit cost : $0.432 /LCY Total job cost : $46 <br />