Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade Access Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source: <br />(CRG) <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,111 CCY factor : 1.165 volume <br />Source of estimated volume :Permit Exhibit 25, p. 27 <br />Source of estimated swell factor : Caterpillar Handbook Edition 32 <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient <br />Average site altitude <br />0.00 % (pos) <br />5,400 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />1,294 <br />tors <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />1.00 <br />1.00 <br />1.00 <br />0.79 <br />1.00 <br />0.44 <br />LCY <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shiff/da) <br />(doz-oc) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />552.20 LCY/hr <br />2,208.80 LCY/hr <br />. <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.59 Hours <br />Unit cost : $0.487 /LCY Total job cost : $630