My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-20_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2008-06-20_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:23 PM
Creation date
7/9/2009 11:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
6/20/2008
Doc Name
Memo & Cost Estimate
From
Jim Stark
To
File
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Grade Refuse Pile <br />:::::::........................................................................................................................... ................. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D101? - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 10,000 LCY factor NA volume <br />10,000 LCY <br />Source of estimated volume : Permit Exhibit 25, p. 6 <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2, 748.7 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />0.00 % (pos) <br />5,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br /> <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat Ht3) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/da) <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.59 <br /> <br />Adjusted unit production : 1632.99 LCY/hr <br />Adjusted fleet production : 6,531.97 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 1.53 Hours <br />Unit cost : $0.165 /LCY Total job cost : $1,645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.