Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And S <br />Permit or other job action : Permit Renewal 05 <br />Task description :Regrade Old Shop Area at Empire Village <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 570 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 13,090 CCY factor : 1.165 volume : 15,250 LCY <br /> <br />Source of estimated volume : Permit Exhibit 25, Table 63, Map 26 <br />Source of estimated swell factor :Division Estimate <br /> <br /> <br /> <br />HOURLY PRODUCTION _:. <br /> <br />Job Condition Correction Factors <br />..._ .:. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 0.97 (Cat HB) <br />Average push gradient : 2.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.43 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 535.35 LCY/hr <br /> Adjusted fleet production : 2,141.41 LCY/hr <br /> <br />............................... <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 7.12 Hours <br />Unit cost : $0.502 /LCY Total job cost : $7,653 <br />