Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade Overland Conveyor Corridor <br /> <br /> <br />HOURLY EQUIPMENT COST .............. .:......... :.. ; .::.::.::.:::....:..:. <br /> Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift bas is : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br /> <br />MATERIAL QUANTITIES ....... :::... <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.125 volume : 5,625 LCY <br /> <br />Source of estimated volume : Permit Exhibit 25, Table 63, Map 26 <br />Source of estimated swell factor :Division Estimate <br /> <br /> <br />HOURLY PRODUCTION «.: <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,748.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff1day) <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 0.99 (Cat HB) <br />Average push gradient : 1.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.53 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 1468.64 LCY/hr <br /> Adjusted fleet production : 5,874.57 LCY/hr <br /> <br /> <br />JOB TIME AND COST :...::: <br />Fleet size : 4 Dozer(s) Total job time : 0.96 Hours <br />Unit cost : $0.183 /LCY Total job cost : $1,029 <br />