amen <br />Earth 8 Environmental <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed in the following areas: between stations A36+00 (+/-) <br />and 41+00 (+/-), approximately 100 feet right of centerline to 250 feet left of centerline; <br />between A41+00 (+/-) and A44+00 (+/-), approximately 100 to 300 feet left of centerline; <br />between A20+00 (+/-) and J15+00 (+/-), approximately 200 to 300 feet left of centerline; <br />between L0+00 (+/-) and L2+00 (+/-), approximately 0 to 200 feet left of centerline; and <br />between stations B 11+00 (+/-) and B 12+00 (+/-), approximately 50 feet left of centerline to 50 <br />feet right of centerline. These areas were ripped to a depth of 6" to 8" using various CAT <br />dozers. The areas were moisture conditioned using a CAT 773 water truck and compaction was <br />performed using a CAT 563 vibratory smooth drum compactor passing over the entire surface <br />at least 4 times. These areas were inspected and accepted by an AMEC representative prior to <br />any fill placement. <br />E) Cut to Fill <br />1) VLF <br />A John Deere 850D excavator, a Komatsu 800 excavator, a CAT 375 excavator, and a CAT <br />385 track excavator excavated structural fill material from the following areas: between <br />stations J2+00 (+/-) and J11+00 (+/-), approximately 50 to 250 feet left of centerline; between <br />stations A14+00 (+/-) and A15+50 (+/-), approximately 100 to 150 feet left of centerline; <br />between stations A18+00 (+/-) and A22+00 (+/-), approximately to 100 feet left of centerline; <br />and between stations A20+00 (+/-) and A22+00 (+/-), approximately 40 feet left of centerline <br />to 40 feet right of centerline. The structural fill material was transported using 777 haul trucks <br />and 40-ton articulating haul trucks. <br />Structural fill was placed between stations A16+00 (+/-) and A36+00 (+/-), approximately 0 to <br />200 feet left of centerline. Structural fill was placed using a CAT D 10 dozer, a CAT D-9 dozer, <br />and two CAT D-8 dozer in 18" to 24" lifts (based on rock size). Moisture conditioning of the <br />fill was performed using a CAT 773-water truck. Each lift was compacted with a CAT 563 <br />smooth drum vibratory compactor passing over the entire surface at least 4 times (method <br />compaction technique is applicable). <br />Structural fill was placed between stations L0+00 (+/-) and L2+00 (+/-), approximately 0 to <br />200 feet left of centerline. Structural fill was placed using a CAT D9 dozer and a CAT D-6 <br />dozer in 18" to 24" lifts (based on rock size). Moisture conditioning of the fill was performed <br />using a CAT 773-water truck. Each lift was compacted with a CAT 563 smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Structural fill was placed between stations J3+00 (+/-) and J4+50 (+/-), approximately 0 to 200 <br />feet left of centerline. Structural fill was placed using a CAT D-8 dozer in 18" to 24" lifts <br />(based on rock size). Moisture conditioning of the fill was performed using a CAT 773-water <br />truck. Each lift was compacted with a CAT 563 smooth drum vibratory compactor passing <br />over the entire surface at least 4 times (method compaction technique is applicable). <br />Sheet 2 of 7 <br />VLF Weekly Report WE 06.20.09.D.doc