My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-07_REPORT - M1980244 (10)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-07-07_REPORT - M1980244 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/8/2009 9:23:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/7/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report- Week of 6/7/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />ameO <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 20, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 06/14/09 through 06/20/09 <br />Days S M T W T F S <br />Work Shifts N D D D D - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 44°F to 48° F (+/-) High: 60° F to 68°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Slash removal continued at the east slope of the Phase 5 VLF. The slash was hauled using 40- <br />ton articulating haul trucks loaded by a CAT 330 excavator. The removed trees and slash were <br />hauled to the Pad 4 tree stockpile. <br />B) Stripping/Slope Re-contouring <br />1) VLF <br />Topsoil relocation was performed using a CAT 375 excavator to load 40-ton articulating haul <br />trucks and CAT 777 haul trucks northeast of the existing substation. The topsoil was hauled to <br />the lower topsoil stockpile, south of the LOB Delivery Road. A CAT D-6 dozer was used to <br />maintain the topsoil stockpile. <br />C) Overburden to Stockpile: <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was stockpiled using a CAT D-9 dozer for <br />future haul. Oversize materials previously stockpiled were moved outside the east slope of the <br />Phase 5 east perimeter road using a CAT D-9 dozer and a CAT D-8 dozer. <br />Sheet 1 of 7 <br />VLF Weekly Report WE 06.20.09.D.doe
The URL can be used to link to this page
Your browser does not support the video tag.