amec' <br />Earth 8 Environmental <br />3) Topsoil Relocation <br />No work performed during the week. <br />C) Overburden to Stockpile: <br />1) VLF <br />Oversize rock within in the Phase 5 VLF fill area was stockpiled using a CAT D-9 dozer for <br />future haul. Oversize materials previously stockpiled were moved to the east slope of the Phase <br />5 east perimeter road using a CAT D-9 dozer and a CAT D-8 dozer. <br />2) VLF Subgrade Preparation <br />No work performed during the week. <br />3) VLF, PSSA Haul Road <br />No work performed during the week. <br />D) Cut to Fill <br />1) VLF <br />A John Deere 850D excavator and Komatsu 800 excavator excavated structural fill material <br />between stations J1+50 and J14+50, approximately 75 to 200 feet left of centerline. The <br />structural fill material was transported using 777 haul trucks and 40-ton articulating haul <br />trucks. Structural fill was placed in the VLF between stations A22+00 (+/-) and A34+00 (+/-), <br />approximately 50 to 400 feet left of centerline. Structural Fill was placed using one CAT D-9 <br />dozer and two CAT D-8 dozer. Lift thickness was 18" to 24" (based on rock size). Moisture <br />conditioning of the fill was performed using a CAT 773-water truck. Each lift was compacted <br />with a smooth drum vibratory roller a minimum of 4-passes over the entire surface (method <br />compaction technique is applicable). <br />Rockbreakers began drilling a shot pattern between stations A17+50 (+/-) and A20+00(+/-) <br />using three track mounted drill rigs. The area was shot Thursday. <br />Rockbreakers began drilling a shot pattern at the new ADR Tank Pad excavation using two <br />track mounted drill rigs. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />3) Sediment Collection Pond <br />Processing and re-compaction of soil liner fill in the Sediment Pond was performed using a <br />CAT D-6 dozer, a John Deere 35D excavator, and a CAT 563 vibratory smooth drum <br />compactor. Soil liner fill from the northeast corner of the pond was removed, replaced, and re- <br />compacted due to saturated material. Six nuclear density tests were performed with results <br />averaging 96% of maximum dry density and averaging at or near optimum moisture content. <br />Moisture-density relations were performed in accordance with ASTM D698-07. Two depth <br />checks were performed and approved by an AMEC representative with assistance from Ames. <br />The southeast corner of the pond will be completed after removal of the access ramp is <br />completed. Work in this area will continue into next week. <br />Sheet 2 of 6 <br />VLF Weekly Report WE 06.13.09.D.doc