2009-06-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-06-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
6/26/2009 12:03:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/24/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 6/7/09.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />E) Material Processing <br />1) South Cresson Clay Processing Area <br />Soil Liner Fill production for the VLF was resumed at the South Cresson Clay Processing area. <br />Location This Week <br />tons Cumulative <br />tons Comments <br />So Cresson Clay Processing 2140 23532 <br />Squaw Gulch Processing - 35,816 Produced and stockpiled <br />Total 0 59,348 <br />F) VLF Miscellaneous Structures <br />No work performed during the week. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill between stations A22+00 (+/-) and A34+00 (+/-), <br />approximately 50 to 400 feet left of centerline <br />AMEC observed the drilling of shot holes and blasting on the East Perimeter Road and the ADR Tank Pad <br />excavation. <br />Sheet 3 of 6 <br />VLF Weekly Report WE 06.13.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.