My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-06-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
6/26/2009 12:03:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/24/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 6/7/09.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aff"Ilk <br />amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 13, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 06/07/09 through 06/13/09 <br />Days S M T WI T F S <br />Work Shifts N D D D - - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 37°F to 42°F (+/-) High: 53° F to 68°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Slash removal continued at the east slope of the Phase 5 VLF. The slash was hauled using 40- <br />ton haul trucks loaded by a CAT 330 excavator. Some of the clearing was performed for power <br />pole installation in the area. The removed trees were hauled to the Pad 4 tree stockpile using <br />40-ton articulating haul trucks. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />B) Stripping/Slope Recontouring <br />1) VLF <br />Stripping and slope recontouring for the East Perimeter Road continued during the week <br />between stations A5+00 (+/-) and A24+00 (+/-), approximately 0 to 150 feet right of <br />centerline, using a CAT D-10 dozer and one CAT 330 excavator. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />Sheet 1 of 6 <br />VLF Weekly Report WE 06.13.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.