My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-02_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-06-02_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:12 PM
Creation date
6/3/2009 9:25:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/2/2009
Doc Name
Revised Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN5
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) <br />o4S <br />sheet 2 of 2 <br />Basis : <br />Material weight : 2,650 pounds/LCY <br />Material description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity : 28.30 LCY <br />>craper Bowl (volume) Basis : <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 28.30 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,700 <br /> Scraper Push dozer Source <br />Scraper loading time 0.60 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirtllt. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 3,350 3.00 3.00 6.00 1069 3.20 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 3.20 minutes <br />Return route : <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 293.88 LCY/hour *** Adjusted for job conditions <br />Optimal number of scrapers per push dozer : 5 Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Unit cost : $1.121 /LCY <br />1.28 minutes <br />5,78 minutes <br />243.92 LCY/hour <br />4 scraper(s) <br />975.69 LCY/hour <br />975.69 LCY/hour <br />Total job time : 6.44 Hours <br />Total job cost : $7,041
The URL can be used to link to this page
Your browser does not support the video tag.