Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Scraper work team -Scraper : Cat 631G <br />-Push dozer :(Cat D9R - 9SU (2005) <br />Agency or organization name : CDRMS <br />Task # : 046 State :Colorado Permit/job #: C-1981-008 <br />Date : 0512612009 County:Montrose Abbreviation :none <br />User: SLB Site : New Horizon Mine Filename : 0008-046 <br />Permit or other job action :Permit Renewal No. 5 <br />Task description :Replace topsoil on 12.45 acre area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Support equipment -Load area :INA <br />-Dump area :!NA <br />Road maintenance -Motor grader :NA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />% Utilization-machine : 100 84 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $78.78 $62.35 NA NA NA NA <br />Operating cost/hour : $124.56 $87.07 NA NA NA NA <br />Ripper op. cost/hour : NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $228.29 $182.20 NA NA NA NA <br />Number of units : 4 2 0 0 0 0 <br />Group subtotals : Work : $1,277.56 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,277,56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 45,194 CCY factor : 1.100 volume : 49,713 LCY <br />Source of quantity take-off :Map 3.02.2-6A, 12.45 acres 27 depth <br />Source of estimated swell factor :Division estimate