Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task #: 045 State : Colorado Permit/job #: C-1981-008 <br />Date : 0512612009 County :Montrose Abbreviation :none <br />User : SLB Site :New Horizon Mine Filename: C008-045 <br />Task description :Redistribute topsoil on BB Road Detour <br />HOURLY EQUIPMENT COST <br />Shift basis <br />(Equipment Description <br />Permit or other job action :Permit Renewal No. 5 <br />Scraper work team -Scraper: Cat 631G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Cost Bre <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />% Utilization-machine : 100 83 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $78.78 $62.35 NA NA NA NA <br />Operating cost/hour : $124.56 $85.79 NA NA NA NA <br />Ripper op. cost/hour : NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $228.29 $180.92 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $1,094.07 Support: $0.00 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 6.279 LCY <br />Total work team cost/hour <br />Swell Loose <br />factor : NA volume <br />1 per day <br />$1,094.07 <br />6,279 LCY <br />Source of quantity take-off :Map 3.02.2-8 <br />Source of estimated swell factor : NA