Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task #: 30C State : Colorado Permit/job #: C-1981-008 <br />Date : 0512612009 County :Montrose Abbreviation :none <br />User : SLB Site : New Horizon Mine Filename :0008-30c <br />Permit or other job action :Permit Renewal No. 5 <br />Task description : Replace topsoil on 57.75 ac Benson property <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper :LCat 631G <br />-Push dozer :ICat D9R - 9SU (2005) <br />Support equipment -Load area :INA <br />-Dump area :INA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />% Utilization-machine : 100 87 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $78.78 $62.35 NA NA NA NA <br />Operating cost/hour : $124.56 $89.86 NA NA NA NA <br />Ripper op. cost/hour : NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $228.29 $184.99 NA NA NA NA <br />Number of units : 4 2 0 0 0 0 <br />Group subtotals : Work : $1,283.14 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,283.14 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 372,680 CCY factor : 1.100 volume : 409,948 LCY <br />Source of quantity take-off :Map 2.05.4-4, 18" A/B, 30" sub <br />Source of estimated swell factor :Division estimate