Revised Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN5
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3oc <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,100 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Loam Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity: 29.00 LCY *** <br />Payload capacity : 35.71 LCY *** hourly production reflects volume per scraper pair on push-pull m odels <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,700 <br /> Scraper Push dozer Source <br />Scraper loading time 0.60 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirtlit. surfaced, watered, maintained <br />Haul Rnuta <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,200 0.83 3.00 3.83 1667 0.85 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.85 minutes <br />-0.83 3.00 2.17 2914 0.61 <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.61 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.76 minutes <br />Unadjusted unit production/hour : 630.87 LCY/hour *** Adjusted for job conditions : 523.63 LCY/hour <br />Optimal number of scrapers per push dozer : 2 Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,047.25 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 2,094.50 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 195.73 Hours <br />Unit cost : $0.613 /LCY Total job cost : $251,144 ',