2009-06-02_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-06-02_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:12 PM
Creation date
6/3/2009 9:25:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/2/2009
Doc Name
Revised Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN5
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 6 <br />HOURLY PRODUCTION sheet 2 of 2 <br />Haulina Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,100 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Loam Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity: 29.00 LCY <br />Payload capacity : 35.71 LCY *** hourly production reflects volume per scraper pair on push-pull models <br /> <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,700 <br /> Scraper Push dozer Source <br />Scraper loading time 0.60 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 800 -3.75 3.00 -0.75 2920 0.35 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route 0.35 minutes <br />1 800 3.75 3.00 6.75 1771 0.56 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />travel time for each segment is adjusted for acceleration/deceleration. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 786.89 LCY/hour *** Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : 2 Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : <br />Unit cost : $0.486 /LCY Total job cost : 0.56 <br /> <br />2.21 <br />653.12 <br />2 <br />1,306.24 <br />2,612.48 <br /> <br />271.09 <br />$344,498 minutes <br /> <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br /> <br />Hours