amec <br />Earth 8 Environmental <br />Location This Week <br />(tons) Cumulative <br />(tons) <br />Comments <br />So Cresson Clay Processing 14,071 18,899 <br />Squaw Gulch Processing - 35,816 Produced and stockpiled <br />Total 14,071 54,715 <br />2) AGOSA (Arequa Gulch Overburden Storage Area) Material Processing <br />Material processing continued intermittently during the week. Material processing was <br />completed for the remainder of the year (per AMES, adequate material on site). <br />G) Miscellaneous <br />No work performed during week. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being performed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />A) LLDPE Geomembrane 80 mil and 100 mil <br />Twenty rolls of LLDPE 100-mil single sided texture geomembrane were relocated from <br />Arequa Processing area to Ames storage yard adjacent to their maintenance yard. AMEC <br />observed the relocation of the geomembrane and no damage occurred. All geomembrane has <br />been re-located <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill at the PSSA haul road between stations K4+00 (+/-) and <br />K10+00 (+/-), right and left of centerline, 0-40-feet. <br />Sheet 3 of 7 <br />VLF Weekly Report WE 05.09.09.D