My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-05-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
5/29/2009 12:06:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/28/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- Week of 5/3/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />AMEC observed Structural Fill and Soil Liner Fill placement at the Sediment Pond. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distributions, Atterberg Limits, and Moisture-Density <br />Compaction testing) for sampled materials, throughout both shifts. Particle Size Distribution test results <br />on three representative samples of structural fill from the VLF fill areas were completed. Test results <br />revealed greater than 30% rock was retained on the 3/4 -inch screen. Method specification compaction is <br />applicable for the materials tested. <br />Concrete cylinders were delivered to an off-site testing laboratory for compressive strength testing. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Planning Items: <br />Work will continue on structural fill placement in the VLF. <br />Processing will continue for the Soil Liner Fill at the South Cresson Clay Processing area. <br />Soil Liner Fill will continue in addition to the installation of the riser pipe and the placement of rip-rap in <br />the Sediment Pond. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Construction meeting on May 5, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily Safety/Tailgate Meetings: AMEC personnel attended the Ames daily safety meeting held at <br />6:40AM prior to the start of shift. Discussions centered on safety and planned work activities. <br />AMEC: <br />Derek Witter, P.E. is updated regularly on the progress of construction and CQA activities and addresses <br />any issues that arise. <br />Others: None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />Sheet 4 of 7 <br />VLF Weekly Report WE 05.09.09.D
The URL can be used to link to this page
Your browser does not support the video tag.