Laserfiche WebLink
CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />STRUCTURE or ITEM DESCRIPTION <br />-Processing conveyor leg/tail fdns. <br />-Batch plant conveyor leg fdns. <br />Slab under batch plant tail pulleys <br />-East retaining wall - batch plant <br />-West retaining wall - batch plant <br />-Crusher and screening plant slab <br />-Four bins - slab for 3 bins DIMENSIONS <br />28 cy <br />7 cy <br />8 Cy <br />4 cy <br />17 cy <br />11 Cy <br />21 cy DEMOLITION MENU SELECTION <br />Push rubble into pit - to 100 ft. <br />Push rubble into pit - to 100 ft. <br />Push rubble into pit - to 100 ft. <br />Push rubble into pit - to 100 ft. <br />Push rubble into pit - to 100 ft. <br />Push rubble into pit - to 100 ft. <br />Push rubble into pit - to 100 ft. QUANTITY <br />28.00 <br />7.00 <br />8.00 <br />4.00 <br />17.00 <br />11.00 <br />21.00 UNIT <br />CY <br />CY <br />CY' <br />CY <br />CY <br />Cy <br />CY UNIT COST <br />$0.6080 <br />$0.6080 <br />$0.6080 <br />$0.6080 <br />$0.6080 <br />$0.6080 <br />$0.6080 TOTAL COST <br />$17.02 <br />$4.26 <br />$4.86 <br />$2.43 <br />$10.34 <br />$6.69 <br />$12.77 <br />-Four bins - walls for 3 bins 22 cy Push rubble into pit - to 100 ft. 22.00 CY $0.6080 $13.38 <br />-Four bins - slab for small bin 5 cy Push rubble into pit - to 100 ft. 5.00 CY $0.6080 $3.04 <br />-Four bins - walls for small bin 10 cy Push rubble into pit - to 100 ft. 10.00 CY $0.6080 $6.08 <br />-2-sided bin S of crusher - slab 5 Cy Push rubble into pit - to 100 ft. 5.00 CY $0.6080 $3.04 <br />-2-sided bin S of crusher - walls 7 cy Push rubble into pit - to 100 It. 7.00 CY $0.6080 $4.26 <br />-Brick sand bin - walls 11 cy Push rubble into pit - to 100 ft. 11.00 Cy $0.6080 $6.69 <br />-Brick sand bin - slab 9 Cy Push rubble into pit - to 100 ft. 9.00 CY $0.6080 $5.47 <br />-7 conveyors <br />-Crusher 2520 cf <br />2000 cf Demo./displappr. dump - to 60 mi. <br />Demo./disp./appr. dump - to 60 mi. 2,520.00 <br />2,000.00 CF <br />CF $1.1437 <br />$1.1437 $2,882.03 <br />$2,287.32 <br />-Screen 2400 cf Demoldisp./appr. dump - to 60 mi. 2,400.00 CF $1.1437 $2, 744.79 <br />-Misc steel debris to remove 3000 cf Demoidisp./appr. dump - to 60 mi. 3,000.00 CF $1.1437 $3,430.99 <br />-Excavate pit to dispose of concrete in 165 cy Excavate/backfill disposal pit 165.00 CY $2.1280 $351.12 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $11,797 1 otal cost (aa)ustea Tor location): a u ou t