My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-21_REVISION - M1977140
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977140
>
2009-05-21_REVISION - M1977140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:45 PM
Creation date
5/28/2009 1:30:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977140
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
TR approval & recalculated bond amount
From
DRMS
To
Mathias Concrete, Inc.
Type & Sequence
TR3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User <br />RCO <br />Site :North Farm Road Pit #1 Filename :M140-002 <br />Agency or organization name: DRMS <br />Permit or other job action : TR-3 <br />Task description : Grade processing and stockpile area after debris burial <br />................................... <br />EQUIPMENT COST <br />Basic machine: Cat D8R Series 11 - 8SU (200 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 9,680 CCY factor : 1.125 volume : 10,890 LCY <br />Source of estimated volume : 6 ac x 1 ft deep <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION .. , <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (a vg.) <br />Average push distance : 60 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,246.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,600 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 484.87 LCY/hr <br /> Adjusted fleet production : 484.87 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 22.46 Hours <br />Unit cost : $0.344 /LCY Total job cost : $3,751
The URL can be used to link to this page
Your browser does not support the video tag.