My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-21_REVISION - M1977140
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977140
>
2009-05-21_REVISION - M1977140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:45 PM
Creation date
5/28/2009 1:30:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977140
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
TR approval & recalculated bond amount
From
DRMS
To
Mathias Concrete, Inc.
Type & Sequence
TR3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or job action : TR-3 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Demolish and dispose of concrete and steel structures demolish 1 40.0 $10,891 <br />.002 -Grade processing and stockpile area after debris burial dozer 1 22.4 $3,751 <br />003 -Rip compaction in processing and stockpile area ripper 1 8.8 $1,548 <br />004 -Carry topsoil to be spread loader 1 38.4 $3,255 <br />005 -Spread topsoil on areas to be revegetated dozer 1 11.41 $1,906 <br />006 -Revegetate disturbed areas revege 1 16.0 $6,308 <br />007 -Haul reclamation equipment to and from site mobilize 1 2.5 $1,254 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 139,8 $28,913 <br />* includes inflation factor adjustment of NA % TOTAL DIRECT COST' _ $28,913 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $584 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />$304 <br />NA <br />$2,891 <br />. not required (or eqp. operator serves as super.) TOTAL O & P = $3,779 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + 0 & P) _ $32,692 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,635 <br />CONTINGENCY- NA* NA total = NA <br />"contingencies accounted for at task level TOTAL INDIRECT COST = $5,914 <br />TOTAL BOND AMOUNT (direct + indirect) _ $34,827
The URL can be used to link to this page
Your browser does not support the video tag.